The short answer
GPU colocation places customer-owned GPU servers in a data center. A useful assessment starts with the complete server configuration, its electrical and thermal requirements, and the network your workload needs. GPU model names alone do not establish facility compatibility.
Start with the system, not just the GPU
Two servers using the same accelerator can have different power supplies, dimensions, cooling methods and service clearances. Send the exact chassis model, GPU count, manufacturer specifications and a rack elevation if you have one. Include switches and storage in the inventory; they are part of the deployment too.
Make the physical fit explicit
The review should reconcile expected and maximum IT load, supply voltage, connector types, airflow direction and the equipment’s supported operating conditions. Ask for written confirmation of the proposed rack and circuit allocation. Do not order hardware on the assumption that a standard rack can support it.
Define what happens after installation
Identify who installs the operating system, monitors the cluster, applies updates and handles failed components. Physical hosting is different from managing an AI platform. Bring an escalation plan and spare-parts strategy so support scope can be agreed before equipment arrives.
Bring to your assessment
- Exact server models, dimensions and weights
- Power supply specifications and measured load, if available
- Air or liquid cooling requirements from the manufacturer
- Target date, users served and first-year growth
Common questions
Can any GPU server be colocated?
No. Compatibility depends on the whole system and the proposed location. Power, cooling, weight and physical access must be reviewed before acceptance.
Does this include GPUs or managed AI software?
This planning path is for hardware you own. Hardware procurement, software operations and any additional services must be separately scoped and confirmed.