The short answer

A deployment is ready to schedule when the hardware, physical fit, network design, responsibilities and acceptance criteria are agreed. Use this checklist to expose missing inputs before equipment ships.

Before requesting a proposal

Prepare an equipment inventory with model numbers, dimensions, weight, rack units and manufacturer requirements. Add a simple architecture diagram and target timeline. Separate confirmed requirements from estimates, and identify the person who can answer technical questions.

Before shipping hardware

Obtain written acceptance of the proposed configuration and confirm receiving instructions, delivery timing, insurance responsibilities and authorized contacts. Agree who supplies rails, cables and spare parts. Confirm that access and installation work can occur when the equipment arrives.

Before moving production traffic

Verify inventory and physical connections, complete agreed acceptance tests and record the actual configuration. Confirm monitoring, support escalation and recovery procedures. Test the rollback path and document who can authorize the production cutover. Retain a handover record for future changes.

Bring to your assessment

  • Inventory, specifications and rack elevation approved
  • Power, cooling, network and service scope confirmed
  • Shipping, access and installation arrangements agreed
  • Acceptance tests, rollback and support ownership documented

Common questions

Can I submit a brief before every detail is known?

Yes. Mark unknowns clearly and identify the owner of each open question. An incomplete brief can start discovery, but it is not an installation approval.

Should I ship equipment as soon as I submit the form?

No. Wait for written acceptance and receiving instructions. A website inquiry does not reserve capacity or authorize delivery.

Planning guidance, not a specification sheet. Infolink capabilities, availability, support scope, pricing and deployment dates must be confirmed for your project. No certification or performance guarantee is implied.